Preventive maintenance, permit-to-work and AI early warnings for power and cooling — with Netra, our AI agent. Built for data centres and mission-critical sites.
Trusted by 500+ clients · 50M+ sq ft managed · 24/7 support
Chiller-2 vibration is trending up. Raise a preventive work order before the next maintenance window?
Why data centres are different
Power and cooling failures cascade fast. Schedule and track PPM for every asset in the chain, with no missed windows.
Plan shutdowns and maintenance around redundancy, with permit-to-work and step-by-step procedures so critical work is controlled.
Every task, sign-off and reading is time-stamped and searchable — ready for customer and internal audits.
Critical infrastructure coverage
UPS and batteries, DG sets, ATS and switchgear, PDUs and RPPs, transformers.
Netra reads your asset and sensor data, spots drift before it becomes an outage, and turns it into a work order.
Spots drift on chillers, UPS and DG sets before it becomes an outage — and turns it into a preventive work order.
Ask "which critical PPMs are overdue?" and get a straight answer — no report builder, no export.
Every morning, Netra sends a risk summary for each hall so shift leads know where to focus.
Compliance and audit
Approval and risk checks before any critical work starts.
MOP, SOP and EOP checklists on mobile, with readings and photos.
Supervisor and customer approvals, time-stamped.
One-click history by asset, hall or date range.
Helps you document maintenance against your Tier objectives and customer SLA requirements — with the exact wording your audits expect.
Integrations
FacTech is the maintenance and operations layer. Connect the systems that already monitor your site — we turn their signals into scheduled, audited work.
Proof
“Netra flagged efficiency drift on two chillers weeks before we would have caught it manually.”
“Permit-to-work and guided procedures took the guesswork out of every shutdown window.”
“Audits that used to take weeks of collecting logs now take an afternoon in FacTech.”
Free guide
PPM schedules for UPS, DG sets, chillers and CRAHs — with permit-to-work and sign-off steps mapped to Tier objectives. A printable, ready-to-use format.
Download the guideFAQ
Get started
Book a 30-minute demo on your power and cooling assets. No obligation — just the platform on your critical infrastructure.